| Datum | Aktenzeichen | ECLI | SIS-Nr. |
|---|---|---|---|
| 13.05.2025 | B 12 BA 12/23 R | ECLI:DE:BSG:2025:130525UB12BA1223R0 | SIS 25 14 23 |
| 04.06.2025 | B 11 AL 4/23 R | ECLI:DE:BSG:2025:040625UB11AL423R0 | SIS 25 14 22 |
| 03.06.2025 | 9 AZR 104/24 | ECLI:DE:BAG:2025:030625.U.9AZR104.24.0 | SIS 25 14 20 |
| 28.01.2025 | 1 AZR 33/24 | ECLI:DE:BAG:2025:280125.U.1AZR33.24.0 | SIS 25 14 16 |
| 21.05.2025 | 10 AZR 121/24 | ECLI:DE:BAG:2025:210525.U.10AZR121.24.0 | SIS 25 14 12 |
| 20.03.2025 | 7 AZR 46/24 | ECLI:DE:BAG:2025:200325.U.7AZR46.24.0 | SIS 25 14 03 |
| 28.01.2025 | 1 AZR 73/24 | ECLI:DE:BAG:2025:280125.U.1AZR73.24.0 | SIS 25 13 98 |
| 05.11.2024 | B 12 KR 9/23 R | ECLI:DE:BSG:2024:051124UB12KR923R0 | SIS 25 13 15 |
| 08.05.2025 | 8 AZR 209/21 | ECLI:DE:BAG:2025:080525.U.8AZR209.21.0 | SIS 25 13 14 |
| 27.03.2025 | 8 AZR 123/24 | ECLI:DE:BAG:2025:270325.U.8AZR123.24.0 | SIS 25 13 01 |
| 27.03.2025 | 8 AZR 63/24 | ECLI:DE:BAG:2025:270325.U.8AZR63.24.0 | SIS 25 12 56 |
| 26.06.2025 | 8 AZB 17/25 | ECLI:DE:BAG:2025:260625.B.8AZB17.25.0 | SIS 25 12 55 |
| 20.02.2025 | 6 AZR 32/24 | ECLI:DE:BAG:2025:200225.U.6AZR32.24.0 | SIS 25 12 54 |
| 25.02.2025 | 9 AZR 5/24 | ECLI:DE:BAG:2025:250225.U.9AZR5.24.0 | SIS 25 12 04 |
| 16.05.2025 | 6 AZN 757/24 | ECLI:DE:BAG:2025:160525.B.6AZN757.24.0 | SIS 25 12 02 |
| 03.12.2024 | B 2 U 11/22 R | ECLI:DE:BSG:2024:031224UB2U1122R0 | SIS 25 11 57 |
| 20.02.2025 | B 1 KR 7/24 R | ECLI:DE:BSG:2025:200225UB1KR724R0 | SIS 25 11 56 |
| 28.11.2024 | B 4 AS 16/23 R | ECLI:DE:BSG:2024:281124UB4AS1623R0 | SIS 25 11 55 |
| 12.02.2025 | 5 AZR 171/24 | ECLI:DE:BAG:2025:120225.U.5AZR171.24.0 | SIS 25 11 51 |
| 27.03.2025 | 4 AZB 29/24 | ECLI:DE:BAG:2025:270325.B.4AZB29.24.0 | SIS 25 11 50 |